[AusNOG] PIPE DC1/2 BNE - FYI
Matt Whitlock
Matt.Whitlock at pipenetworks.com
Wed Mar 21 21:58:18 EST 2012
Just had confirmed that DC2 is now live again as water has been removed
and the area is considered safe for operation.
In DC1, UPS1 is now live again and UPS3 has just come back.
We are working to confirm the A/C situation as 1 riser cupboard has not
yet been passed for re-powering.
General light and power is down between floors 7 and 11.
Matt.
________________________________
From: ausnog-bounces at lists.ausnog.net
[mailto:ausnog-bounces at lists.ausnog.net] On Behalf Of Christopher
Pollock
Sent: Wednesday, 21 March 2012 8:52 PM
To: AusNOG at lists.ausnog.net
Subject: Re: [AusNOG] PIPE DC1/2 BNE - FYI
If anyone needs any hands on deck, we can be at 127C on about 15 minutes
notice if needed, just call the main number.
Cheers,
--
Christopher Pollock,
io Networks Pty Ltd.
e. chris at ionetworks.com.au
p. 1300 1 2 4 8 16
d. 07 3188 7588
m. 0410 747 765
skype: christopherpollock
http://www.ionetworks.com.au
In-house, Outsourced.
On Wed, Mar 21, 2012 at 8:43 PM, Brent Paddon <brent.paddon at gmail.com>
wrote:
Is about to go dark. Currently running on UPS, water is coming
into the building risers from a higher floor than the DC's are on.
Doesnt sound like they can do anything to keep the power up at this site
at the moment.
_______________________________________________
AusNOG mailing list
AusNOG at lists.ausnog.net
http://lists.ausnog.net/mailman/listinfo/ausnog
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.ausnog.net/pipermail/ausnog/attachments/20120321/d97b9d80/attachment.html>
More information about the AusNOG
mailing list