<div dir="ltr"><div>We've also had this happen at Global Switch and Metronode over the years, not that unusual but as always it's up to the customer to plan for losing a single feed and cater for single feed devices.</div><div><br></div><div>I've seen work occur on power circuits at DCs where the operator didn't isolate the feed (aka hot). As much as you plan and ensure your customers are aware of the hazard, all it takes is a sparky to accidentally clip the wrong cable and things go sideways very quickly. The large bang, smoke drifting around the DC and the (junior) sparky falling off of a ladder is a good indicator that hot work is high risk, dangerous and should be avoided as much as possible.</div><div><br></div><div>I know it sucks that you've got some single in feed gear but gosh I'd rather someone make it home.</div><div><br></div><div>Damien</div><div class="gmail_extra"><br><div class="gmail_quote">On Wed, Nov 8, 2017 at 10:49 PM, Patrick Cole <span dir="ltr"><<a href="mailto:z@amused.net" target="_blank">z@amused.net</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">James,<br>
<br>
We had this sort of maintenance performed in Equinix SY1 once in the last 10-20 years.<br>
<br>
You must just be lucky.<br>
<br>
Regards,<br>
<br>
Patrick<br>
<span class=""><br>
Wed, Nov 08, 2017 at 09:21:39PM +1000, James Cunningham wrote:<br>
<br>
<br>
> I'm assuming this is a result of NextDC announcing maintenance at S1 where<br>
> they are turning off one of the power feeds to your racks? We got one of<br>
</span>> these as well. <br>
<span class="">><br>
> Is it just me, or am I the only one concerned that NextDC have to turn off<br>
> power to one of our power feeds in our racks? We have been in Equinix and<br>
> Global Switch data centres for about 15 years, and never had them power<br>
> off our feeds to our racks before during their maintenance processes.<br>
><br>
> What gives?<br>
><br>
> J.<br>
><br>
> ------------------------------<wbr>------------------------------<wbr>------------------------------<wbr>-----------------<br>
><br>
> Hi All,<br>
><br>
</span>> Â <br>
<span class="">><br>
> One of our DC providers is removing some power from a single feed in some<br>
> of our racks soon, and a couple of our customers have some single fed<br>
</span>> units that are connected to the â**wrongâ** rail.<br>
><br>
> Â <br>
<span class="">><br>
> We are looking to help them out with ATS or STSs. I remember some<br>
> discussion some time ago about whether one is better than the other, and<br>
> some quite technical arguments why you would prefer one or the other.<br>
><br>
</span>> Â <br>
<span class="">><br>
> For a standard 10A outlet and a 500-1kw load what do people recommend<br>
> these days?<br>
><br>
</span>> Â <br>
><br>
> Thanks,<br>
><br>
> Andrew<br>
><br>
> Â <br>
><br>
> Get Outlook for iOS<br>
<span class="im HOEnZb"><br>
> ______________________________<wbr>_________________<br>
> AusNOG mailing list<br>
> <a href="mailto:AusNOG@lists.ausnog.net">AusNOG@lists.ausnog.net</a><br>
> <a href="http://lists.ausnog.net/mailman/listinfo/ausnog" rel="noreferrer" target="_blank">http://lists.ausnog.net/<wbr>mailman/listinfo/ausnog</a><br>
<br>
<br>
</span><span class="HOEnZb"><font color="#888888">--<br>
Patrick Cole <<a href="mailto:z@wwwires.com">z@wwwires.com</a>><br>
Senior Network Specialist<br>
World Without Wires<br>
PO Box 869. Palm Beach, QLD, 4221<br>
Ph: <a href="tel:0410%20626%20630" value="+61410626630">0410 626 630</a><br>
</font></span><div class="HOEnZb"><div class="h5">______________________________<wbr>_________________<br>
AusNOG mailing list<br>
<a href="mailto:AusNOG@lists.ausnog.net">AusNOG@lists.ausnog.net</a><br>
<a href="http://lists.ausnog.net/mailman/listinfo/ausnog" rel="noreferrer" target="_blank">http://lists.ausnog.net/<wbr>mailman/listinfo/ausnog</a><br>
</div></div></blockquote></div><br></div></div>