<html><body><div style="color:#000; background-color:#fff; font-family:times new roman, new york, times, serif;font-size:12pt"><div><span>Thanks for all the off-list posts. General consensus seems to be that this would be to complete the diverse path by utilising a fibre (that is already in place) for the second path but that they have to splice into to run to the building (via diverse entry). <br></span></div><div><span><br></span></div><div><span>Not as I read and mis-understood to mean they were taking an existing path and just splitting it upstream to just provide "diverse" entry points (which would be rather pointless).</span></div><div><br><span></span></div><div><span>Probably should have thought about it a bit more and might have come to the same conclusion myself.</span></div><div><br><span></span></div><div><br><span></span></div><div><span>Thanks,</span></div><div><span>Tony.<br></span></div><div><span><br></span></div><div><br></div>  <div
 style="font-family: times new roman, new york, times, serif; font-size: 12pt;"> <div style="font-family: times new roman, new york, times, serif; font-size: 12pt;"> <font size="2" face="Arial"> <hr size="1">  <b><span style="font-weight:bold;">From:</span></b> Tony <td_miles@yahoo.com><br> <b><span style="font-weight: bold;">To:</span></b> "ausnog@lists.ausnog.net" <ausnog@lists.ausnog.net> <br> <b><span style="font-weight: bold;">Sent:</span></b> Thursday, 15 December 2011 3:29 PM<br> <b><span style="font-weight: bold;">Subject:</span></b> [AusNOG] fibre path diversity<br> </font> <br><meta http-equiv="x-dns-prefetch-control" content="off"><div id="yiv1675737068"><div><div style="color:#000;background-color:#fff;font-family:times new roman, new york, times, serif;font-size:12pt;"><div>Hi all,</div><div><br></div><div>This is just for my own curiosity more than anything and I know there are some people on this list that know about this kind
 of stuff.</div><div><br></div><div>I received a scheduled outage notification from a carrier today that had this in the description of works:</div><div><br></div><div><span style="font-size:12pt;">"We are cutting the 96
fibre cable so that we can create a new splice joint to complete diversity to <street address>"</span></div><div><br><span style="font-size:12pt;"></span></div><div><span style="font-size:12pt;">Does this sound like a customer has requested diverse fibre paths to the premises to they are just splicing the fibre somwhere upstream to create the diversity ? This seems slightly strange to me as you would still have a single redundant path upstream of this new splice, which appears to be <200m from the end point.<br></span></div><div><br></div><div>Again, this isn't a service that we've requested be installed, we just happen to have an existing service that will be disrupted as a result of the above works. Just curious.<br></div><div><br></div><div><br></div><div>Thanks,</div><div>Tony.<br></div></div></div></div><meta http-equiv="x-dns-prefetch-control" content="on"><br>_______________________________________________<br>AusNOG mailing list<br><a
 ymailto="mailto:AusNOG@lists.ausnog.net" href="mailto:AusNOG@lists.ausnog.net">AusNOG@lists.ausnog.net</a><br><a href="http://lists.ausnog.net/mailman/listinfo/ausnog" target="_blank">http://lists.ausnog.net/mailman/listinfo/ausnog</a><br><br><br> </div> </div>  </div></body></html>