The current copper network is actually fully mashed :)<br><br><div class="gmail_quote">On Thu, Apr 21, 2011 at 2:15 PM, David Hughes <span dir="ltr"><<a href="mailto:David@hughes.com.au">David@hughes.com.au</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex;"><div class="im"><br>
<br>
On 21/04/2011, at 1:52 PM, Brent Paddon wrote:<br>
<br>
> Yeah, sure, it'll be fully meshed.<br>
<br>
</div>I'm sure it'll be as fully meshed as the current copper last mile is ....<br>
<br>
<br>
David<br>
...<br>
<br>
</blockquote></div><br><br clear="all"><br>-- <br>--<br>Brent Paddon<br><br>Director | Over the Wire Pty Ltd <a href="mailto:brent.paddon@overthewire.com.au">brent.paddon@overthewire.com.au</a> | <a href="http://www.overthewire.com.au">www.overthewire.com.au</a><br>
Phone: 07 3847 9292 | Fax: 07 3847 9696 | Mobile: 0400 2400 54<br>